NUMBER 148
DATE: 11/07/95
Sector Processing Center (SPC):
During September, NOA, ESA, CSU and JMA processed greater than 97% of A data into B1/B2 data.
Normal operations for September were reported by NOA, ESA and JMA.
CSU reports continued successful backup of their GOES-7 collection from NASA Ames, so that over 97% of
the data were obtained. CSU also collected nearly all transmitted images from GOES-8; however, eclipse
operations during September caused loss of full disk images in the 0600 UTC time slot, as only Northern
Hemisphere images were available as substitutes.
Satellite Calibration Center (SCC):
AC data were received for September 95 from GMS-5, GOES-7, METEOSAT-5 and NOAA-14. BC data for
August 94 and January for GOES-7 were shipped to the GPC.
Global Processing Center (GPC):
The GPC continued to receive B2 data, BC data and correlative data in a routine manner.
Production of NOAA-12 (preliminary) B3 data is current. Final B3 data have been produced through
December 94.
Production of NOAA-14 (preliminary) B3 is current. Production of final B3 will require normalizing the
calibration to the standard, NOAA-9.
Production of GOES-7 (preliminary) B3 data is completed through November 94. Merger of several sources
of data beyond November will be required. Final B3 data have been produced through June 94.
GOES-8 B2 data are now being received routinely, but the formatting software has not been written yet.
Production of METEOSAT-3 (preliminary) B3 data is completed through January 95. The special CD-ROM
datasets sent by ESA for February through April 95 have not been processed yet. Final B3 data have been
produced through June 94.
Production of METEOSAT-5 (preliminary) B3 data is current. Final B3 data for METEOSAT-4 and 5 have
been produced through June 94.
Production of GMS-4 (preliminary) B3 data is completed through May 95. GMS-5 B2 data deliveries are
current, but formatting software has not been written yet. Final B3 data have been produced through June
94.
Production of all INSAT-1 (preliminary) B3 data has been completed. Final INSAT-1 B3 has also been
produced for the period April 88 through March 89. Other data could not be reliably calibrated.
TOVS correlative data processing is current. The revised version of the whole TOVS dataset will be delivered
once documentation has been completed.
Production of the ice/snow correlative dataset has been completed through 93. The revised version of the
whole ice/snow dataset will be delivered once documentation has been completed.
DX/D1/D2 data production continues: data for March, April, May, and July 92 have been completed.
Deliveries of DX/D1/D2 will begin once the documentation is completed.
The ISCCP World Wide Web Home Page can be accessed at URL
http://isccp.giss.nasa.gov
ISCCP Central Archive (ICA):
The ICA continued to receive B1 data from NOA, AES, ESA, CSU and JMA and B3 and C data from the GPC
in a routine manner.
The health of GMS-5, METEOSAT-5, GOES-7, GOES-8, NOAA-12 and NOAA-14 remained good. GOES-9
is scheduled to become operational in December 95.
Stage B3: July 83 - June 94 (11 years)
Stage CD: July 83 - December 91 (8.5 years)
Stage C1: July 83 - June 91 (8 years)
Stage C2: July 83 - June 91 (8 years)
Delivery backlog for B3 data = 9 months (with respect to planned schedule). B3 data for 132 months have
been archived.
Delivery backlog for new DX/D1/D2 data = 45 months (with respect to planned schedule). C1 data for 96
months have been archived.