ISCCP PROJECT STATUS REPORT

NUMBER 255 DATE: 10/08/04

CENTER ACTIVITIES

Sector Processing Center (SPC):

During August, NOA and JMA processed more than 99% of A data into B1/B2 data.

Normal operations for August were reported by NOA and JMA. No reports were received from EUM, CSU and MSC. A problem with the MSC conversion of 10-bit counts to 8-bit counts has been discovered and is being investigated.

CSU is also supplying the AC data for GOES-12 until MSC operations resume.

Satellite Calibration Center (SCC):

AC data were received for August 04 from METEOSAT-5, METEOSAT-7, GOES-9, GOES-10, GOES-12 and NOAA-16 (AVHRR and HIRS). BC data for June 04 for METEOSAT-5, METEOSAT-7, GOES-9, GOES-10 and GOES-12 were shipped to the GPC.

All AC data are now received via Internet.

All BC reports now include normalization for the visible, standard infrared and "split-window" infrared channels (except METEOSAT and GOES-12 which do not have a split-window channel), and the "water vapor" channels.

Global Processing Center (GPC):

The GPC continued to receive B2 data, BC data and correlative data in a routine manner by Internet. All data products (except DX) from the GPC are delivered by ftp to NOAA/NCDC and to NASA Langley. NCDC is now acquiring the older DX data by ftp from NASA Langley, so that future DX data can be delivered this way by the GPC.

Deliveries of B2 data from NOAA-16 are current. Production of NOAA-16 (preliminary) B3 is complete through December 03. Final B3 data have been produced through December 03.

Deliveries of B2 data from NOAA-17 are current. Production of NOAA-17 (preliminary) B3 is complete through December 03. Final B3 data have been produced through December 03.

Deliveries of B2 from GOES-9 (at 155E) are current. Production of GOES-9 (preliminary) B3 is complete through December 03. Final B3 data have been produced through December 03.

Deliveries of B2 data from GOES-10 are current. Production of GOES-10 (preliminary) B3 data is complete through December 03. Final B3 data have been produced through December 03.

Deliveries of B2 data from GOES-12 are current. Production of GOES-12 (preliminary) B3 data is complete through December 03. Final B3 data have been produced through December 03.

Deliveries of B2 data from METEOSAT-5 (at 63E) are current. Production of METEOSAT-5 (preliminary) B3 data is complete through December 03. Final B3 data have been produced through December 03.

Deliveries of B2 data from METEOSAT-7 are current. Production of METEOSAT-7 (preliminary) B3 data is compete through December 03. Final B3 data have been produced through December 03.

A sample of radiance data from the Chinese FY-2 satellite has been obtained and a test of the format is underway. Also a formatter for METEOSAT-8 has to be developed.

Deliveries of TOVS correlative data are current. TOVS processing is complete through December 03.

Deliveries of snow/ice correlative data are current. SI processing is complete through December 03.

DX/D1/D2 data processing is complete through September 01. Testing of the modified cloud detection algorithm, using 1.6 micron radiances over snow and ice surfaces in the daytime polar regions, is still underway.

Tables are available on the ISCCP Web site that provide the up-to-date version numbers for all ISCCP data products. The whole calibration dataset (Stage BT data) and the ancillary map grid dataset that accompanies the gridded data products are available on the ISCCP ftp site. The entire D2 dataset is also available on the ftp site. Browse data now available on the Web site are monthly mean data for July 83 through September 01 and climatology results based on the period July 83 through September 01. The radiance calibration tables have been updated through December 03. The ISCCP World Wide Web Home Page can be accessed at URL

http://isccp.giss.nasa.gov

ISCCP Central Archive (ICA):

The ICA at NOAA NCDC continued to receive B1 data from NOA, MSC, EUM, CSU and JMA and B3 and D data from the GPC in a routine manner. A new effort is underway to bring the documentation for the B1 datasets up to the same level as for the B3 datasets, mainly by developing READ programs for each dataset through all the format and satellite changes. The ICA, with assistance from the GPC, is working on this project. If successful, the next re-processing of the cloud products might be based on the B1 rather than the B3 datasets, providing 10 km sampling rather than 30 km sampling (GPCP is also exploring the use of the B1 dataset to extend its daily precipitation product back to July 83.)

SATELLITE HEALTH

The health of GOES-9, GOES-10, GOES-12, METEOSAT-5, METEOSAT-7, NOAA-16 and NOAA-17 remained good. METEOSAT-6 and GOES-11 are in stand-by mode. METEOSAT-8 unexpectedly entered safe mode on 4 October 04, was successfully restored to operations, and then entered safe mode again on 6 October 04. Although no hardware failures were detected between these two events, the reason for these events is unknown.

DATA DELIVERED

Stage B3: July 83 - December 03 (20.5 years)

Stage TV: July 83 - December 03 (20.5 years)

Stage SI: July 83 - December 03 (20.5 years)

Stage D: July 83 - September 01 (18.2 years)


Satellite and Data Delivery Charts

Satellite Network
B Level Data Products


OPEN ITEMS

* Delivery backlogs for B2 data (EUM, CSU, MSC = 1 month).

* Delivery backlog for B3 data = 2 months (with respect to planned schedule). B3 data for 246 months have been archived.

* Delivery backlog for DX/D1/D2 data = 29 months (with respect to planned schedule). D1/D2 data for 219 months have been archived.