ISCCP PROJECT STATUS REPORT

NUMBER 301 DATE: 01/16/09

Sector Processing Center (SPC):

During October and November, NOA (100%, 100%), EUM (99.2%, 100%), CSU (100%, 100%) and JMA (100%, 100%) processed A data into B1/B2 data. MSC collected and processed about 65.4% and 54.4% of the A data for September and October.

Normal operations for October and November were reported by NOA, EUM, CSU and JMA. October was the last month of operations for MSC.

NCDC plans to take over processing of GOES-EAST and GOES-WEST data in the early part of this year (the lost GOES-EAST data will be recovered from the archives).

Satellite Calibration Center (SCC):

AC data were received for October and November 08 from MTSAT-1R, FY-2C, METEOSAT-7, METEOSAT-9, GOES-11, GOES-12 (AC data is being supplied by CSU for both GOES satellites) and NOAA-18. BC data are complete through September 08 for MTSAT-1R, FY-2C, METEOSAT-7, METEOSAT-9, GOES-11 and GOES-12, but there is a problem with the FY-2C visible radiance data in September.

All AC data are now received via Internet.

All BC reports now include normalization for the visible, standard infrared and "split-window" infrared channels (except for METEOSAT-7 and GOES-12 which do not have a split-window channel).

Global Processing Center (GPC):

The GPC continued to receive B2 data, BC data and correlative data in a routine manner by Internet. All data products from the GPC are delivered by ftp to NOAA/NCDC and to NASA Langley.

Deliveries of B2 data from NOAA-18 are current. Production of NOAA-18 (preliminary) B3 is complete through December 07. Final B3 data have been produced through June 07.

Deliveries of B2 data from NOAA-17 are current. Production of NOAA-17 (preliminary) B3 is complete through December 07. Final B3 data have been produced through June 07.

Deliveries of B2 data from GOES-11 are current. Production of GOES-11 (preliminary) B3 is complete through June 07. Final B3 data have been produced through June 07.

Deliveries of B2 data from GOES-12 are complete through October 08, although substantial numbers of images have been missed since July 08. The supply of data has ceased until NOAA takes over processing. Production of GOES-12 (preliminary) B3 is complete through June 07. Final B3 data have been produced through June 07.

Deliveries of B2 data from METEOSAT-7 (at 55E) are current. Production of METEOSAT-7 (preliminary) B3 data is complete through June 07. Final B3 data have been produced through June 07.

Deliveries of B2 data from METEOSAT-9 are current. Production of METEOSAT-9 (preliminary) B3 data is complete through June 07. Final B3 data have been produced through June 07.

Deliveries of B2 data from MTSAT-1R are current. Production of MTSAT-1R (preliminary) B3 is complete through June 07. Final B3 data have been produced through June 07.

Delivery of B2 data from FY-2C are current.

Deliveries of TOVS correlative data are current. TOVS processing is complete through June 07.

Deliveries of snow/ice correlative data are current. SI processing is complete through June 07.

DX/D1/D2 data processing is now complete through June 07 (without FY-2C).

The online bibliography of papers based on ISCCP datasets has been updated through December 06; over 1300 ISCCP-related papers have been published.

The cloud climatology plots and browse data, the BT and D2 holdings on the ftp site, the radiance calibration and product version number tables have all been updated through June 07.

The ISCCP Home Page can be accessed at URL

http://isccp.giss.nasa.gov

ISCCP Central Archives (ICA):

The ICA at NOAA NCDC continued to receive B1 data from NOA, JMA, EUM, CSU, MSC and CMA and B3 and DX/D1/D2 data from the GPC in a routine manner.

SATELLITE HEALTH

The health of GOES-11, MTSAT-1R, METEOSAT-7, METEOSAT-9, FY-2C, NOAA-17 and NOAA-18 remained good. METEOSAT-5, METEOSAT-6, METEOSAT-8, GOES-13 and MTSAT-2 are in stand-by mode. GOES-10 has been moved to 60 degrees west longitude to provide better coverage of South America; Brazil has indicated plans to provide B1/B2 data from this satellite for ISCCP.

DATA DELIVERED

Stage B3: July 83 - June 07 (24.0 years)

Stage TV: July 83 - June 07 (24.0 years)

Stage SI: July 83 - June 07 (24.0 years)

Stage D: July 83 - June 06 (24.0 years)


Satellite and Data Delivery Charts

Satellite Network
B Level Data Products


OPEN ITEMS

* Delivery backlogs for B2 data (none)

* Delivery backlog for B3 data = +11 month (with respect to planned schedule). B3 data for 288 months have been archived.

* Delivery backlog for DX/D1/D2 data = +11 months (with respect to planned schedule. D data for 288 months have been archived.